Pipeline

Various Survey Types ➤ Pipeline 

Pipeline

A summary of our process

  • The legal description of the centerline of the easement and the coordinates of the centerline vertex points are provided.
  • Using this data, we geolocate the centerline and illustrate the easement in relation to its width.
  • We then determine and depict the area and easement boundary, along with the calculated corners of the easement parcel. We compare the proposed pipeline with the as-built pipeline and adjust as needed, using the COGO points of the as-built pipeline to ensure it fits within the pipeline easement.
  • We receive the pipeline map for the entire subdivision. Based on this, we divide the pipeline according to the specific property requirements and identify their POC, POB, and POT.
  • Using the existing as-built pipeline map, we identify intersections of multiple pipelines and create the surface site area to establish the easement. We prepare separate surveys for each.
  • We label all bearings and distances of the pipeline, along with detailed views for sections where the pipelines are more challenging to interpret. These are extended surveys of the as-built pipeline surveys.
Pipeline Easement Survey 1_Texas

Pipeline Easement Survey 2_Texas

Pipeline As-Built Survey 1_Texas

Pipeline As-Built Survey 2_Texas

Pipeline Site Easement Survey 1_Texas

Pipeline Site Easement Survey 2_Texas

© 2025 TheDraftRack. All rights reserved.