The proposed pipeline was compared with the as-built pipeline and adjusted as needed, using the COGO points of the as-built pipeline to ensure it fit within the pipeline easement.
We received the pipeline map for the entire subdivision. Based on this, we divided the pipeline according to the specific property requirements and identified their POC, POB, and POT.
For the same property, multiple as-built pipelines of different sizes were present. Separate surveys were prepared for each.
All bearings and distances of the pipeline were labeled, along with detailed views for sections where the pipelines were more challenging to interpret.
These are extended surveys of the as-built pipeline surveys.
Using the existing as-built pipeline map, we identified intersections of multiple pipelines and created the surface site area to establish the easement.
Multiple reference points, including property or section corners, were used & showed to accurately depict the surface site easement and its POC, POB, and POT.