We were provided with the base setup drawing and COGO points for all utilities.
Using the COGO points, we mapped the sewer line, labeled the pipe sizes, and marked all cleanouts.
Referring to the main pipeline and sub-pipeline, we assigned station numbers to all utility blocks.
Details for all sewer manholes were included, specifying their manhole number, station number, top elevation, invert inlet, and outlet pipe elevations.